HfFeP

metal
· HfFeP

HfFeP is an intermetallic compound combining hafnium, iron, and phosphorus, belonging to the family of refractory metal phosphides. This is a research-stage material studied for its potential combination of high stiffness and moderate density, positioning it as a candidate for advanced structural applications requiring lightweight-to-strength performance in extreme environments. The material's notable rigidity and density profile suggest interest in high-temperature or radiation-tolerant applications where traditional superalloys or ceramics may be limited, though industrial adoption remains in the exploratory phase.

refractory intermetallics researchhigh-temperature structural applicationsradiation-resistant materials developmentlightweight refractory compoundsnuclear or aerospace exploration

Compliance & Regulations

?EAR?Conflict Free?RoHS?REACH?TSCA?Prop 65
PropertyValueUnitConditionsSource
Bulk Modulus(K)2 entries
30,857.2
ksi
30,695.8
ksi
Poisson's Ratio(ν)
0.2600
-
Shear Modulus(G)2 entries
18,098.1
ksi
17,429.2
ksi
N entriesMultiple entries per property — large groups are collapsed; click a summary row to expand. Use filters above to narrow by form / heat treatment / basis.
Verified Unverified Low confidence (<80%) Link to source
PropertyValueUnitConditionsSource
Density(ρ)
0.3873
lb/in³
Verified Unverified Low confidence (<80%) Link to source
PropertyValueUnitConditionsSource
Band Gap(Eg)
0.000
eV
Seebeck Coefficient(S)
-9.350
µV/K
Verified Unverified Low confidence (<80%) Link to source
PropertyValueUnitConditionsSource
Energy Above Hull(ΔEhull)
0.000
eV/atom
Formation Energy(ΔHf)
-1.031
eV/atom
Verified Unverified Low confidence (<80%) Link to source

Regulatory Screening

Environmental

Export Control

RoHS, REACH, and Prop 65 statuses are validated against official substance lists (ECHA SVHC Candidate List, OEHHA Prop 65, RoHS Annex II). Other regulations are estimated from composition and material classification. All screening is a starting point for due diligence — always verify with your supplier before making compliance decisions.